WINX
Frankfurt am Main
- Office building
- Integrated building with the latest energy saving technologies for optimal and cost-effective operation
- Around 5000 data points for primary systems and around 40,000 data points for individual room controls, some with lighting and window blind control
- System integration across all disciplines
- Project focus: Innovative solutions with integration of multiple disciplines for cost-efficient energy use. High degree of flexibility to simplify future modifications to room divisions
- Energy management integrating 1600 meters
- Use of an IP network bus structure throughout (BacNet; Dali, KNX, SMI, MP-Bus, Modbus)
- Brands used: Schneider, Loytec, RK-TEC
- Deployment period: 2017-2019
- Client: Fa. bam
Global Tower
Frankfurt am Main
- Office building
- Integrated building with the latest energy saving technologies for optimal and cost-effective operation
- Around 4000 data points for primary systems and 900 fire dampers and around 30,000 data points for individual room controls, some with lighting and window blind control
- System integration across all disciplines
- Project focus: Innovative solutions with integration of multiple disciplines for cost-efficient energy use. High degree of flexibility to simplify future modifications to room divisions
- Energy management integrating 600 meters
- Use of an IP network bus structure throughout (BacNet; Dali, KNX, SMI, MP-Bus, Modbus)
- Brands used: Schneider, Loytec, RK-TEC
- Deployment period: 2019-2020
- Client: Fa. Salvia
Grand Central
Frankfurt am Main
- Office building
- Integrated building with the latest energy saving technologies for optimal and cost-effective operation
- Around 4000 data points for primary systems and 1000 fire dampers and around 20,000 data points for individual room controls, some with lighting and window blind control
- System integration across all disciplines
- Project focus: Innovative solutions with integration of multiple disciplines for cost-efficient energy use. High degree of flexibility to simplify future modifications to room divisions
- Energy management integrating 300 meters
- Use of an IP network bus structure throughout (BacNet; Dali, KNX, MP-Bus, Modbus)
- Brands used: Schneider, Loytec, RK-TEC
- Deployment period: 2018-2020
- Client: Fa. Peter Groß Bau
Jaguar
Munich
- car dealership
- Integrated building with the latest energy saving technologies for optimal and cost-effective operation
- Around 1000 data points for primary systems and 100 fire dampers and around 300 data points for individual room controls
- System integration across all disciplines
- Project focus: Innovative solutions with integration of multiple disciplines for cost-efficient energy use. High degree of flexibility to simplify future modifications to room divisions
- Energy management integrating 80 meters
- Use of an IP network bus structure throughout (BacNet; MP-Bus, Modbus)
- Brands used: Schneider, RK-TEC
- Deployment period: 2018-2019
- Client: Fa. Lausser
Naabtaler Milchwerke
Schwarzenfeld
- Production plant
- Integrated building with the latest energy saving technologies for optimal and cost-effective operation
- Around 1000 physical data points
- System integration across all disciplines and integrating system via OPC to a scada system
- Project focus: Controling and regulation of HVAC systems including connection to process technology
- Brands used: Siemens S7
- Deployment period: 2017-2018
- Client: Fa. Lausser
Cloud No. 7
Stuttgart
- Hotel (5 stars) and office building
- Integrated building with the latest energy saving technologies for optimal and cost-effective operation
- Around 3000 data points for primary systems and around 1800 data points for individual room controls
- System integration across all disciplines
- Project focus: Innovative solutions with integration of multiple disciplines for cost-efficient energy use. High degree of flexibility to simplify future modifications to room divisions
- Use of an IP network bus structure throughout (BacNet; KNX, Modbus)
- Brands used: Schneider, Loytec, Distech, RK-TEC
- Deployment period: 2016-2018
- Client: Fa. Cloud No. 7
AUDI energy center
Ingolstadt
- Central power generation
- Expansion of the energy center with 2 boilers, each with 20 GW output
- Controling and regulation of boilers
- System integration across all disciplines and integrating system via OPC to a scada system
- Project focus: Challenge through the performance of the boilers. Two burners each with oil and gas supply
- Brands used: B&R
- Deployment period: 2015-2016
- Client: Fa. Lausser
Wiesenhof Hähnchen
Bogen
- Rebuilding production plant after fire
- Controling and regulation of HVAC systems
- Around 6000 physical data points
- System integration across all disciplines and integrating system via OPC to a scada system
- Project focus: Controling and regulation of HVAC systems including connection to process technology
- Brands used: Siemens S7
- Deployment period: 2015-2016
- Client: Fa. Lausser
Opernplatz
Frankfurt am Main
- Hotel (5 stars) and office building
- Integrated building with the latest energy saving technologies for optimal and cost-effective operation
- Around 5000 data points for primary systems and around 2000 data points for individual room controls
- System integration across all disciplines
- Project focus: Innovative solutions with integration of multiple disciplines for cost-efficient energy use. High degree of flexibility to simplify future modifications to room divisions
- Use of an IP network bus structure throughout (BacNet; LON, Modbus)
- Brands used: Schneider, Spega, Loytec, Distech
- Deployment period: 2015-2016
- Client: Fa. bam
Neue Mainzer Straße
Frankfurt am Main
- Office building
- Integrated building with the latest energy saving technologies for optimal and cost-effective operation
- Around 2000 data points for primary systems and around 6000 data points for individual room controls
- System integration across all disciplines
- Project focus: Innovative solutions with integration of multiple disciplines for cost-efficient energy use. High degree of flexibility to simplify future modifications to room divisions
- Use of an IP network bus structure throughout (BacNet; LON, Modbus)
- Brands used: Schneider, Spega, Loytec
- Deployment period: 2015-2016
- Client: Fa. Groß + Partner
Taunusanlage 8
Frankfurt am Main
- Office building
- Integrated building with the latest energy saving technologies for optimal and cost-effective operation
- Around 5300 data points for primary systems and around 12,000 data points for individual room controls
- System integration across all disciplines
- Project focus: Innovative solutions with integration of multiple disciplines for cost-efficient energy use. High degree of flexibility to simplify future modifications to room divisions
- Energy management integrating 600 meters
- Use of an IP network bus structure throughout (BacNet; Dali, KNX, SMI, MP-Bus, Modbus)
- Brands used: Schneider, Loytec, RK-TEC
- Deployment period: 2015-2016
- Client: Fa. Züblin
Gerber Areal
Stuttgart
- Shopping centre and apartments
- Integrated building with the latest energy saving technologies for optimal and cost-effective operation
- Around 12,000 data points for primary systems and around 1000 data points for individual room controls
- System integration across all disciplines
- Project focus: Innovative solutions with integration of multiple groups for cost-efficient energy use. Substantial cost savings through universal use of Modbus technology for field devices (sensors, pumps, actuators, etc.)
- Use of an IP network bus structure throughout (BacNet and Modbus)
- Brand used: Schneider
- Deployment period: 2013-2014
- Client: Fa. Lausser
Swiss Life Deutschland
Garching/Munich
- Office building
- Integrated building with the latest energy saving technologies
- for optimal and cost-effective operation.
- Around 3,000 data points for primary systems and around 1000 data points for individual room controls (BKT)
- System integration across all disciplines
- Project focus: Innovative solutions with integration of multiple disciplines for cost-efficient energy use
- Use of an IP network bus structure throughout (BacNet)
- Brand used: Schneider
- Deployment period: 2013-2014
- Client: Fa. Lausser
Wallstabe & Schneider- Energy Plant
- Industrial energy plant
- Complete regulation/control of the system
- System integration between all disciplines incl. connection of all data points as a WEB solution
- Project focus: Innovative solutions with integration of the counter for determining energy demand. Control/regulation of 2 boilers and 1 CHP. BacNet IP network bus structure throughout.
- Brand used: Schneider Electric
- Brand used: Schneider Electric
- Client: Fa. Lausser
Audi Zentrum Stuttgart/Feuerbach
Wiesbaden
- Building with sales area, offices and workshops
- Integrated building with the latest energy saving technologies for optimal and cost-effective operation
- Around 1100 data points for primary systems and around 200 data points for individual room controls, some with lighting and window blind control
- System integration across all disciplines
- Project focus: Innovative solutions with integration of multiple disciplines for cost-efficient energy use. IP network bus structure throughout (BacNet)
- Brand used: Schneider Electric
- Deployment period: 2013
- Client: Fa. Lausser
Silvertower
Frankfurt am Main
- Office building
- Integrated building with the latest energy saving technologies for optimal and cost-effective operation
- Around 6000 data points for primary systems and around 10,000 data points for individual room controls, some with lighting and window blind control
- System integration across all disciplines
- Room control including wireless control
- Project focus: Innovative solutions with integration of multiple disciplines for cost-efficient energy use. High degree of flexibility to simplify future modifications to room divisions
- Use of an IP network bus structure throughout (BacNet and LON)
- Brands used: Wago, Spega, Loytec, Warema, Emation
- Deployment period: 2011-2012
- Client: Commerzbank, Frankfurt
Space 20 office building
Darmstadt
- Office building
- Integrated building with the latest energy saving technologies
- for optimal and cost-effective operation
- System integration across all disciplines
- Project focus: Innovative solutions with integration of multiple disciplines. Increased demands in the areas of heat generation and refrigeration using heat pumps.
- for cost-efficient energy use
- Use of an IP network bus structure throughout (BacNet)
- Brand used: Schneider Electric
- Deployment period: 2011-2012
- Client: Ed. Züblin AG, Darmstadt
Museum of the Bavarian Kings
Hohenschwangau
- Building housing offices, a hotel and a museum
- Integrated building with the latest energy saving technologies for
optimal and cost-effective
operation
- Around 1000 data points for primary systems and around 1000
- data points for individual room controls
- System integration across all disciplines
- Project focus: Innovative solutions with integration of multiple
disciplines for cost-efficient energy use. High
degree of flexibility to simplify future modifications to room divisions
- Use of an IP network bus structure throughout (BacNet)
- Brands used: Wago, Emation
- Deployment period: 2011-2012
- Client: Kühn Bauer & Partner, Munich
Feldberg School
Oberursel
- Building with classrooms
- Integrated building with the latest energy saving technologies for
optimal and cost-effective
operation
- Around 500 data points for primary systems and around 1000
- data points for individual room controls, some with lighting
and window blind control
- System integration across all disciplines
- Room control, some using wireless control
- Project focus: Innovative solutions with integration of multiple
disciplines for cost-efficient energy use. High
degree of flexibility to simplify future modifications to room divisions
- Use of an IP network bus structure throughout (BacNet and LON)
- Brand used: Schneider Electric
- Deployment period: 2011
- Client: Ed. Züblin AG, Darmstadt
Kö-Blick Düsseldorf
- Office and apartment building
- Integrated building with the latest energy saving technologies for
optimal and cost-effective
operation
- Around 2000 data points for system integration across all
disciplines
- Innovative solutions with integration of multiple
disciplines for cost-efficient energy use.
- Use of an IP network bus structure throughout (BacNet)
- Brands used: Wago, Emation
- Deployment period: 2011
- Client: Alpine Bau Deutschland AG , Cologne
LFK-Lenkflugkörpersysteme GmbH
Schrobenhausen
- Office building
- Integrated building with the latest energy saving
technologies
- for optimal and cost-effective operation
- Around 3000 data points for individual room controls, some with
lighting and window blind control
- System integration across all disciplines
- Room control, some using wireless control
- Project focus: Innovative solutions with integration of multiple
disciplines
- for cost-efficient energy use. High degree of flexibility to
simplify future
- modifications to room divisions
- Use of an IP network bus structure throughout (BacNet)
- Brands used: Wago
- Deployment period: 2011
- Client: Voith Industrial Services GmbH, Kirchseeon
Euro City Center West
Mannheim
- Building housing offices and a hotel
- Integrated building with the latest energy saving
technologies
- for optimal and cost-effective operation.
- Around 500 data points for primary systems and around 1800
data points
- for individual room controls (incl. a connection to the
hotel reservation system)
- System integration across all disciplines
- Wireless room control throughout
- Project focus: Innovative solutions with integration of multiple
disciplines
- for cost-efficient energy use.
- Use of an IP network bus structure throughout
- Brands used: Beckhoff, Distech Control
- Deployment period: 2010
- Client: bam
Seehotel Überfahrt
Rottach-Egern
- Building with individual room controls
- Integrated building with the latest energy saving technologies for
optimal and cost-effective
operation
- Around 240 luxury rooms
- System integration across all disciplines
- Room control including wireless control
- Project focus: Innovative solutions with integration of multiple
disciplines for cost-efficient energy use. High
degree of flexibility to simplify future modifications to room divisions
- Use of bus structure throughout using LON technology
- Brands used: TAC
- Deployment period: 2010
- Client: Jost und Josefine Hurler, Munich
Sonnenblock
Munich
- Office building
- Integrated building with the latest energy saving
technologies
- for optimal and cost-effective operation
- Around 900 data points for primary systems and around 3000 data points for individual room controls
with lighting
(DALI) and window blind control (using integrated
light shadowing and automatic slat tracking)
- System integration across all disciplines
- Project focus: Innovative solutions with integration of multiple
disciplines for cost-efficient energy use. High
degree of flexibility to simplify future modifications to room divisions
- Use of an IP network bus structure throughout
- Brands used: TAC, Spega, Loytec
- Deployment period: 2009-2010
- Client: MEAG
SV Sparkassen Versicherung
Wiesbaden
- Office building
- Integrated building with the latest energy saving technologies for
optimal and cost-effective
operation
- Around 1000 data points for primary systems and around 2000
data points for individual room controls, some with lighting and
window blind control
- System integration across all disciplines
- Room control including wireless control
- Project focus: Innovative solutions with integration of multiple
disciplines for cost-efficient energy use. High
degree of flexibility to simplify future modifications to room divisions
- Use of an IP network bus structure throughout (LON)
- Brands used: TAC
- Deployment period: 2009-2010
- Client: SV Sparkassen Versicherung, Wiesbaden
Romeo & Julia
Frankfurt
- Office building
- Integrated building with the latest energy saving
technologies
- for optimal and cost-effective operation
- Around 900 data points for primary systems and around 3000
data points
- for individual room controls with lighting(DALI) and
window blind control (using integrated light shadowing and
automatic slat tracking)
- System integration across all disciplines
- Project focus: Innovative solutions with integration of multiple
disciplines for cost-efficient energy use.
High degree of flexibility to
- simplify future modifications to room divisions
- Use of an IP network bus structure throughout
- Brands used: TAC , Spega, Loytec
- Deployment period: 2009
- Client: IFM
Voith
Heidenheim
- Office building
- Integrated building with the latest energy saving
technologies for optimal and
cost-effective operation
- Around 600 data points for primary systems and around 1000
data points for individual room controls, some with
lighting and window blind control
- System integration across all disciplines
- Room control including wireless control
- Project focus: Innovative solutions with integration
of multiple disciplines for cost-effective
energy use. High degree of flexibility to
simplify future modifications to room divisions
- Use of an IP network bus structure throughout (BacNet and
LON)
- Brands used: TAC
- Deployment period: 2009
- Client: Bilfinger Berger AG, Stuttgart
Lufthansa Training & Conference Center
Frankfurt
- Building housing offices, a hotel and training rooms
- Integrated building with the latest energy saving
technologies for optimal and
cost-effective operation
- Around 2000 data points for primary systems and around 1000
data points for individual room controls
- System integration across all disciplines
- Room control including wireless control
- Project focus: Innovative solutions with integration
of multiple disciplines for cost-effective
energy use. High degree of flexibility to
simplify future modifications to room divisions
- Use of an IP network bus structure throughout (LON)
- Brands used: TAC
- Deployment period: 2009
- Client: Schneider Electric Buildings Germany,
Oberhausen
The Squaire (formerly the Airrailcenter)
Frankfurt am Main
- Building housing offices, a hotel (Hilton) and shopping arcades
- Integrated building with the latest energy saving technologies for
optimal and cost-effective
operation
- Around 24,000 data points for primary systems and around 125,000
data points for individual room controls, some with lighting and
window blind control
- System integration across all disciplines
- Room control, some using wireless control
- Project focus: Innovative solutions with integration of multiple
disciplines for cost-efficient energy use. High
degree of flexibility to simplify future modifications to
room divisions
- Use of an IP network bus structure throughout
- Brands used: Wago, FIS (GLT)
- Deployment period: 2008-2010
- Client: YIT
Nymphenburger Höfe
Munich
- Office and apartment building
- Integrated building with the latest energy saving
technologies, for optimal and cost-effective
operation
- Around 2000 data points for primary systems and around 13000
data points for individual room controls with lighting and
window blind control
- System integration across all disciplines
- Entirely wireless room control
- Project focus: Innovative solutions with integration of multiple
disciplines for cost-efficient energy use. High
degree of flexibility to simplify future modifications to room divisions
- Use of an IP network bus structure throughout
- Brands used: Beckhoff
- Deployment period: 2008-2010
- Client: IKR
Nextower BT B
Frankfurt am Main
- Office building
- Integrated building with the latest energy saving technologies, for
optimal and cost-effective operation
- Around 4000 data points for primary systems and lighting as well as around 1200
communicative BSK-BUS data points
- System integration across all disciplines
- Project focus: Innovative solutions with integration of multiple disciplines. The
individual room controls were implemented during construction of the building. J&K
was responsible for starting up and relevant visualisation of
the building control system (approx 7000 DP). Heavy demands in the areas of heat generation and refrigeration
using heat pumps, geothermal and free cooling.
- Lighting (part of the task of J&K) was implemented throughout with equipment from
Beckhoff and connected to the corresponding TAC interfaces
and plugged into the TAC building control system.
- Use of an IP network bus structure throughout
- Brands used: TAC, Loytec, Beckhoff
- Deployment period: 2008-2009
- Client: bam
ARCOTEL Rubin
Hamburg
- Hotel with 168 rooms and suites
- Individual room control for 168 rooms with a connection to the
hotel reservation system
- 6 air ventilation plants serving the hotel rooms,
conference rooms, administrative areas, halls and
technical areas.
- 1x underground parking garage ventilation system with smoke extraction feature
- 1x underground parking garage ventilation system with smoke extraction feature
- Heat provided by remote heat exchanger
- 15 individual controls for the conference rooms with a connection
to the EIB room control device
- around 700 data points for primary systems
- Bus structure: IP network and FTT10 channels
- Brands used: TAC, Loytec, Svea, Alre
- Client: BPM Bau Projekt Managment
ARCOTEL Camino
Stuttgart
- Hotel with 168 rooms and suites
- Individual room control for 168 rooms with a connection to the
hotel reservation system
- 6 air ventilation plants serving the hotel rooms,
conference rooms, administrative areas, halls and
technical areas.
- 1x underground parking garage ventilation system with smoke extraction feature
- Refrigeration supply using 2 refrigeration systems
- Heat supplied using a boiler system (LON)
- 15 individual controls for the conference rooms with a connection to
an EIB room control device
- Around 700 data points for primary systems
- Bus structure: IP network and FTT10 channels
- Brands used: TAC, Loytec, Svea, Alre
- Deployment period: 2007
- Client: BPM Bau Projekt Managment
Erlangen Shopping Centre
Arcaden
- Shopping centre with a central facility, individual controls for
shops
- 17 circulating air coolers for mall area, 20 partial air conditioning ventilation systems for shops
- over 30 small ventilation system for technical, exhaust air, grease outlet, etc.
- 3 absorber refrigerators, long-distance heat generation
- Around 2300 data points for primary systems
- Around 110 individual room controls (individual shops or
sections)
- Connection of around 850 M-Bus counters using external M-Bus
- Serial connection of all alarms to a DECT system
- Bus structure: IP network (in part optic fibre), FTT10
channels
- Brand used: TAC, Loytec, Svea, ELSO, BTR
- Deployment period: 2007
- Client: HochTief
Hotel Vier Jahreszeiten Kempinski
Munich
- Luxury - Hotel
- Hotel refurbishment with the latest energy saving
technologies, for optimal and cost-effective
operation
- around 300 data points for individual hotel room controls
- Around 100 data points for ventilation/heating/cooling
- Use of an IP network bus structure throughout
- Brands used: TAC, Loytec, Svea
- Deployment period: March 2007 to January 2008
- Client: Fa. Otto-Hermann
Carl Benz Center
Stuttgart
- Event venue and hotel in Stuttgart
- Integrated building with the latest energy saving
technologies, for optimal and cost-effective
operation
- Around 500 integrated LonWorks nodes (around 2600 data points) for
individual room control (over 160), lighting, primary systems
- Project focus: Innovative solutions with integration of multiple
disciplines for cost-efficient energy use.
Individual room control
- Connection to the hotel reservations system for optimal
room control
- Use of an IP channel bus structure throughout
- Brands used: TAC, Loytec, Svea
- Deployment period: 2005-2006
- Client: Bilfinger+Berger
Melia Hotel
Berlin
- Hotel in Berlin
- Integrated building with the latest energy saving
technologies
- , for optimal and cost-effective operation
- Around 480 integrated LonWorks nodes (around 4600 data points) for
individual room controls (over 360), lighting, primary systems
- Project focus: Innovative solutions with integration of multiple
disciplines for cost-effective energy use.
Individual room control
- Connection to the hotel reservations system for optimal
room control
- Use of an IP channel bus structure throughout
- Brands used: TAC, Loytec
- Deployment period: 2005-2006
- Client: MCE
Van Technology Center VTC
Stuttgart
- Daimler Chrysler Technology Center in Stuttgart
- Integrated building with the latest energy saving
technologies, for optimal and cost-effective
operation
- Around 3200 integrated LonWorks nodes (around 6000 data points)
for individual room controls, lighting, primary systems, RWA,
lighting
- System integration between all disciplines incl. connection of
all data points via OPC to a supervisory Scada system
- Project focus: Innovative solutions with integration of multiple
disciplines for cost-efficient energy use. High
degree of flexibility to simplify future modifications to room divisions
- Use of an IP backbone bus structure throughout
- Brands used: TAC, Loytec, Warema, Svea, Baikirch
- Deployment period: 2005-2006
- Client: MCE
THE WESTIN
Leipzig
- First-class hotel in Leipzig
- Integrated building with the latest energy saving
technologies
- , for optimal and cost-effective operation
- Around 900 integrated LonWorks nodes (around 5500 data points) for
individual room controls (over 400), lighting, primary systems
- Project focus: Innovative solutions with integration of multiple
disciplines
- for cost-efficient energy use. High demands for
lighting/individual room control.
- Connection to the hotel reservations system for optimal
room control
- Use of a Fast Backbone bus structure throughout
- Brands used: TAC, Loytec, Svea
- Deployment period: 2004-2007
- Client: Hotelgesellschaft Gerberstr
FEP 1 - Frankfurter Europark for Deutsche Bank
Frankfurt am Main
- Deutsche Bank Data Centre
- Integrated building with the latest energy saving
technologies, for optimal and cost-effective
operation
- Around 2400 integrated LonWorks nodes (around 6500 data points)
for individual room controls (over 700), primary systems
- Project focus: Innovative solutions with integration of multiple
disciplines for cost-efficient energy use. High
degree of flexibility to simplify future modifications to
room divisions. Cooling via 8 cooling units, distributed across
4 buildings – connected by a ring pipe.
- Use of a fast backbone bus structure throughout
- Brands used: TAC, Loytec, Svea
- Deployment period: 2004-2006
- Client: Corvus
Office building in Rosenheimer Platz
Munich
- Office building
- Integrated building with the latest energy saving
technologies
- for optimal and cost-effective operation.
- Around 3600 integrated LonWorks nodes (around 9000 data points) for individual room controls,
primary system, window blinds, lighting
- System integration across all disciplines
- Project focus: Innovative solutions with integration of multiple
disciplines
- for cost-effective energy use. High degree of flexibility to
simplify future modifications to room divisions.
- Use of an IP network bus structure throughout (over 350
routers in total)
- Brands used: TAC, Loytec, Warema, Svea
- Deployment period: 2004-2006
- Client: Bayerische Hausbau
Parkhotel
Frankfurt am Main
- First-class hotel in Frankfurt
- Integrated building with the latest energy saving
technologies, for optimal and cost-effective
operation
- Around 230 integrated LonWorks nodes (around 1100 data points) for
individual room controls (over 80), lighting, primary systems
- Project focus: Innovative solutions with integration of multiple
disciplines for cost-effective energy use
- Use of a fast backbone bus structure throughout
- Brands used: TAC
- Deployment period: 2004-2006
- Client: Parkhotel
Allianz
Munich
- Office building
- Integrated building with the latest energy saving
technologies
- , for optimal and cost-effective operation
- Around 1800 integrated LonWorks nodes (around 6300 data points)
for individual room controls (over 500), lighting, primary systems
- Project focus: Innovative solutions with integration of multiple
disciplines for cost-efficient energy use. High
degree of flexibility to simplify future modifications to
room divisions
- Use of a fast backbone bus structure throughout
- Brands used: TAC, Echelon , Svea
- Deployment period: 2004-2005
- Client: Imtech
Domhotel
Cologne
- First-class hotel in Cologne
- Integrated building with the latest energy saving
technologies, for optimal and cost-effective
operation
- Around 200 integrated LonWorks nodes (around 1500 data points) for
individual room controls, lighting and primary systems.
- Project focus: Innovative solutions with integration of multiple
disciplines for cost-effective energy use
- Use of a fast backbone bus structure throughout
- Brands used: TAC
- Deployment period: 2004-2005
- Client: Domhotel
Münchener Hypothekenbank (MHB)
Munich
- Bank building in Munich
- Integrated building with the latest energy saving
technologies, for optimal and cost-effective
operation
- Around 180 integrated LonWorks nodes (around 900 data points) for
primary systems
- Project focus: Innovative solutions with integration of multiple
disciplines for cost-effective energy use
- Use of a fast backbone bus structure throughout
- Brands used: TAC
- Deployment period: 2004
- Client: Bilfinger+Berger
Klinikum Rechts der Isar - Energy Centre
Munich
- Hospital energy centre with three boilers
- Complete regulation/control of the system
- System integration between all disciplines incl. connection of
all data points via OPC to a supervisory Scada system
- Project focus: Innovative solutions with integration of the counter for
determining energy demand. Use of an Profibus
bus structure throughout
- Brand used: Siemens
- Deployment period: 2008
- Client: YIT
Daimler Crysler (127/6)
Stuttgart
- Daimler Chrysler office building in Stuttgart
- Integrated building with the latest energy saving
technologies
- , for optimal and cost-effective operation.
- Around 600 integrated LonWorks nodes (around 2000 data points) for individual room controls,
primary system, window blinds, lighting
- System integration between all disciplines incl. connection of
all data points via OPC to a supervisory Scada system
- Project focus: Innovative solutions with integration of multiple
disciplines for cost-efficient energy use. High
degree of flexibility to simplify future modifications to room divisions
- Use of a fast backbone bus structure throughout
- Brands used: TAC, Echeleon, Warema, Svea
- Deployment period: 2004
- Client: Daimler Chrysler
Centrum für innovative Medizin (CIM)
Hamburg
- Office and research building
- Integrated building with the latest energy saving
- technologies, for optimal and cost-effective
operation
- Around 1200 data points for primary systems
- Project focus: Innovative solutions with integration of multiple
disciplines for cost-efficient energy use. High
degree of flexibility to simplify future modifications to room divisions
(changes by tenants). Connection to neutral
control system (Wonderware)
- Use of a fast backbone bus structure throughout
- Brands used: TAC, Loytec, Warema, Svea
- Deployment period: 2004
- Client: M+W Zander
Lemo
Munich
- Administrative headquarters of a well-known manufacturer of
plug connections
- Integrated building with the latest energy saving
technologies, for optimal and cost-effective
operation
- Around 120 integrated LonWorks nodes for individual room controls
- System integration of GEA fan convectors
with a LON-interface and a proprietary DDC system, connection
to Kieback+Peter building control system
- Project focus: Innovative solutions with integration of multiple
disciplines for cost-efficient energy use. High
degree of flexibility to simplify future modifications to room
divisions.
- Deployment period: 1998